專利商品網


    快速搜尋        



楊亦東

個人網站
營建工程系(所)
 
學經歷:
  美國密西根大學安娜堡校區土木工程博士
 
專業技術
  計算智慧、電腦模擬、營建管理、資訊科技
   
研究成果與計畫
 

.


期刊論文

  1. Yang, I-Tung and Chou, J.S. (2010). "Multiobjective optimization for manpower assignment in consulting engineering firms." Applied Soft Computing, accepted (SCI, EI 期刊).
  2. Hsie, M., Chang, C. J., Yang, I-Tung, Huang, C. Y. (2009/11). "Resource-constrained scheduling for continuous repetitive projects with time-based production units." Automation in Construction, 18(7), 942-949 (SCI, EI 期刊).
  3. Chou, J. S., Yang, I-Tung, and Chong, W. K. (2009/08). "Probabilistic simulation for developing likelihood distribution of engineering project cost." Automation in Construction, 18(5), 570-577 (SCI, EI 期刊).
  4. Yang, I-Tung (2008/05). "Distribution-free Monte Carlo simulation: Premise and refinement." Journal of Construction Engineering and Management, ASCE, 134(3), pp. 352-360. (SCI, EI期刊)
  5. Yang, I-Tung (2008/02). "Utility-based decision support system for schedule optimization." Decision Support Systems, 44(3), pp. 595-605. (SCI, EI 期刊) (NSC-95-2221-E-011-219-MY3)
  6. Yang, I-Tung (2008/02). "Risk modeling of dependence between project task durations." Computer-Aided Civil and Infrastructure Engineering, 22(6), pp. 419-429 (SCI, EI 期刊)
  7. Yang, I-Tung (2007). "Using particle swarm optimization to facilitate bicriterion time-cost tradeoff analysis." Journal of Construction Engineering and Management, ASCE, 133(7), pp. 498-505 (SCI, EI).
  8. Yang, I-Tung (2007) “Risk modeling of dependence between project task durations.” Computer-Aided Civil and Infrastructure Engineering, 22(6), pp. 419-429 (SCI, EI).
  9. Yang, I-Tung (2007). “Complex project crashing analysis with aid of particle swarm optimization." International Journal of Project Management, 25(6), pp. 637-646 (EI).
  10. Yang, I-Tung (2006) “Using Gaussian copula to simulate repetitive projects.” Construction Management and Economics 24(9), pp. 899-909 (EI).
  11. Yang, I-Tung (2005). “Impact of budget uncertainty on project time-cost tradeoff.” IEEE Transactions on Engineering Management, IEEE, 52(2), pp.167-174 (SCI, SSCI, EI).
  12. Yang, I-Tung (2005) “Simulation-based estimation for correlated cost elements.” International Journal of Project Management, 23(4), pp 275-282 (EI).
  13. Yang, I-Tung (2005). “Chance-constrained time-cost tradeoff analysis considering funding variability." Journal of Construction Engineering and Management, ASCE, 131(9), pp. 1002-1012 (SCI, EI).
  14. Yang, I-Tung and Chang, Chi-Yi (2005) “Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding.” International Journal of Project Management, 23(7), pp. 546-553 (EI).
  15. Yang, I-Tung and Ioannou, Photios G. (2004). “Scheduling system with focus on practical concerns in repetitive projects.” Construction Management and Economics, 22(6), pp. 619-630 (EI).
  16. Ioannou, Photios G. and Yang, I-Tung (2004). “Discussion of comparison of linear scheduling model and repetitive scheduling method.” Journal of Construction Engineering and Management, ASCE, 130(3), pp. 461-463. (SCI, EI)
  17. Ioannou, Photios G. and Yang, I-Tung (2003). “Discussion of algorithm for determining controlling path considering resource continuity.” Journal of Computing in Civil Engineering, ASCE, 17(1), pp. 70-72. (SCI, EI)
  18. Everett, John G. and Yang, I-Tung (1997). “Workers’ comp. Premiums: disparities in penalties for identical losses.” Journal of Construction Engineering and Management, ASCE, 123(3), pp.312-317. (SCI, EI)

研討會論文

  1. Yang, I-Tung (2010). "Multiobjective simulation optimization for bridge maintenance planning." Proceedings of the International Engineering Research Conference, IERC, Bohol, Philippine, January.
  2. Yang, I-Tung (2009). "Risk-based multiobjective optimization model for bridge maintenance planning." Proceedings of the Second International Symposium on Computational Mechanics, ISCM II, Hong Kong and Macau, November.
  3. Yang, I-Tung (2008). "Site layout model addressing safety requirement." Proceedings of the 12th International conference on Computing in Civil and Building Engineering, ICCCBE XII, Beijing, China, October.
  4. Yang, I-Tung (2007). “Pareto archived PSO optimization for time-cost tradeoff analysis.” 2007 IEEE Congress on Evolutionary Computation, Singapore, September.
  5. Yang, I-Tung (2006). “Multiobjective PSO algorithm in project staff management.” International Symposium on Automation and Robotics in Construction 2006, ISARC 2006, Tokyo, Japan, October.
  6. Yang, I-Tung (2005). “Stochastic scheduling considering interdependent activity durations.” International Conference on Construction Engineering and Management, ICCEM 2005, Seoul, Korea, October.
  7. Yang, I-Tung (2005). “Scheduling construction projects with stochastic resource constraints.” International Conference on Construction Engineering and Management, ICCEM 2005, Seoul, Korea, October.
  8. Yang, I-Tung (2005). “Managing cost estimation risks during planning stage.” Hong Kong Institute of Value Management 7th International Conference, Hong Kong, June.
  9. Yang, I-Tung (2004).“New scheduling system for pipeline projects.” ASCE Pipeline 2004 Conference, US Grant Hotel, San Diego, US, August.
  10. Yang, I-Tung (2004). “Project time-cost tradeoff with uncertain financial feasibility.” The 2004 International Conference in Management Sciences and Decision Making, Tamkang University, Taipei, Taiwan, June.
  11. Yang, I-Tung (2003).“Computerized scheduling tool for repetitive construction project.” Computer Application in Civil and Hydraulic Engineering Conference, National Taiwan University of Technology and Science, Taipei, Taiwan, June.
  12. Yang, I-Tung (2002). “Stochastic analysis on project duration under the requirement of continuous resource utilization.” The 10th Conference for International Group of Lean Construction (IGLC-X), Gramado, Brazil, pp. 527-540.
  13. Yang, I-Tung and Ioannou, Photios G. (2002). "Repetitive project planner." The 9th International Conference on Computing in Civil and Building Engineering (ICCCBE-IX), Taiwan, pp. 1257-1262.
  14. Yang, I-Tung and Ioannou, Photios G. (2001) "Resource-driven scheduling for repetitive projects: a pull-system approach." The 9th Conference for International Group of Lean Construction (IGLC-IX), National Singapore University, Singapore, pp. 365-377.
  15. Yang, I-Tung and Ioannou, Photios G. (2001) "Repetitive project planner." Great Lakes Civil Engineering Graduate Student Research Symposium, Case Western Reserve University, Cleveland, USA.

專書及技術報告

  1. Yang, I-Tung (2006). "Stochastic estimation model for uncertain cost elements." National Science Council Report. (NSC-94-2211-E-032-020).
  2. Yang, I-Tung (2005). "Project time-cost tradeoff model under uncertain financial constraint." National Science Council Report. (NSC-93-2211-E-032-019).
  3. Yang, I-Tung (2004). "The identification algorithm for controlling sequence and critical activities in repetitive construction projects." National Science Council Report. (NSC-92-2211-E-032-030).
  4. Yang, I-Tung (2002). “Repetitive Project Planner: Resource-driven scheduling for repetitive construction projects.” Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, Michigan, USA.