專利商品網


    快速搜尋        



王慶煌

個人網站
營建工程系(所)
 
學經歷:
  美國華盛頓大學博士
 
專業技術
  Construction Industrial Analysis, Project Management and Economics, Project Financial Management, , Real Estate Investment, Project Performance Evaluation
   
研究成果與計畫
 

期刊論文

  1. Ching-Hwang Wang , Chin-Chang Chuang, Chia-Chang Tsai, A Fuzzy DEA-Neural Approach to Measuring Design Service Performance in PCM Project, Journal of Automation in Construction, Vol.5, Issue18 , 702-713(SCI,2009).
  2. Ching-Hwang Wang , Chih-Han Kao, A Multi-Clustering Centers Approach to Enhancing the Performance of SOM Clustering Ability, Journal of Information Science and Engineering, Vol. 5 , No. 4, p.1103-1119 (SCI, 2009).
  3. Ching-Hwang Wang , Yu-Chun Huang, Wei-Hsien Lee, An Extended Factor-Functioning Mechanism for Construction Project Duration Simulation, Journal of Automation in Construction,(SCI, Final Review, 2009).
  4. Ching-Hwang Wang , Chih-Han Kao, and Yu-Chun Huang , Fuzzy Effectiveness Analysis Approach to Evaluating Project Design Service Performance, Journal of WSEAS TRANSACTIONS on COMPUTERS  (EI, 2009).
  5. Ching-Hwang Wang, Wei-Hsien Lee, and Yu-Chun Huang , Influence of Rate Stability on Project Cost Simulation, Journal of Computer–Aided Civil and Infrastructure Engineering, Vol. 23, Number 1, p. 45-58, (SCI, 2008).
  6. Ching-Hwang Wang , Chih-Han Kao, Wei-Hsien Lee, A new interactive model for improving the learning performance of back propagation neural network, Journal of Automation in Construction, Vol.16,Issue 6, p.745-758 (SCI, 2007).
  7. Ching-Hwang Wang, Chin-Chang Chuang, Chia-Chang Tsai, PCM in Taiwan: A Diagnosis Knowledge-Base in PCM Plan/Design Phase, Journal of Computing in Civil Engineering, ASCE, Volume 21, Issue 2, p. 102-111 (SCI, 2007)
  8. Ching-Hwang Wang, Chin-Chang Chuang, Chia-Chang Tsai, Knowledge-based diagnosis model for PCM executing problems in public construction, Journal of Construction Management & Economics, Vol. 25 Issue 2, p129-142 (EI, 2007).
  9. Chin-Chang Chuang,Ching-Hwang Wang , Chih-Han Kao, Improving Network Learning Performance using an Interactive Adjusting Algorithm, Journal of WSEAS TRANSACTIONS on COMPUTERS Issue 4, Vol.6, p.715 (EI, 2007).

專書及技術報告 

  1. Wang, C.H., Kao, C.H., and Tsai, C.C., A Neural-Based Model of Financial Rating for Contractors, the 5th International Conference on Engineering Computational Technology, 2006.
  2. 蔡嘉章、王慶煌、鄭義嚴、莊進昌,PCM執行問題診測模式之研究,第十屆營建管理學術交流論文研討會,2006.
  3. 蔡嘉章、王慶煌、王偉嘉、莊進昌,模糊多層級效能模式評估PCM服務績效之研究,第十屆營建管理學術交流論文研討會,2006.
  4. 李威憲、王慶煌、郭克勤,探討因子狀態延續行為之影響,第十屆營建管理學術交流論文研討會,2006.
  5. 邱靜宜、王慶煌、吳姿儀,以財務的觀點進行建設公司績效衡量之研究,第十屆營建管理學術交流論文研討會,2006.
  6. 王慶煌、江孟修、王美慧,以延遲選擇權建構不動產之投資決策模式,第十二屆營建工程與管理學術研討會,2007.