專利商品網


    快速搜尋        



呂守陞

個人網站
營建工程系(所)
 
學經歷:
  美國密西根大學博士
 
專業技術
  專案管理、風險管理、營建管理資訊/決策支援系統、工程最適化評估、績效管理
   
研究成果與計畫
 

期刊論文

  1. Ioannou, Photios G. and Leu,  Sou-Sen, “Average-Bid Method-Competitive Bidding Strategy.” Journal of Construction Engineering and Management, Vol.119, No.1, pp.131-147 (1993). 
  2. Chen, Chiu-Nan, Leu, Sou-Sen, and Chen, Yao-Zhong “Development of Integrated Tunnel Information System.”  Journal of Rock Mechanics, Vol.18 (Supplement) pp.124-127 (1997)。
  3. Leu, Sou-Sen and Chiou, Wuu-Fwu, “Studies on Functional Performances of Taipei Road Pavements.” Transportation Planning Journal, Vol.27, No.2, pp.339-370 (1998).(in chinese)
  4. Leu, Sou-Sen and Day, Huey-Meei, “A Study of Virtual Reality Application to Formwork Latout Planning.” Journal of Architecture, Vol.27, pp.89-102 (1998).(in chinese) 
  5. Leu, Sou-Sen, Lin, Sheng-Feng, Chen, Ching-Kuang and Wang, She-Wen. “Analysis of Powder Factor for Tunnel Blasting using Neural Networks.”  The  International Quarterly Journal of Blasting and Fragmentation, Vol.2, pp.433-448 (1998).
  6. Leu, Sou-Sen, Chen, An-Ting and Yang, Chung-Huei. “Fuzzy Optimal Model for Resource-constrained Construction Scheduling.” Journal of Computing in Civil Engineering, ASCE, Vol.13, No.3, pp.207-216 (1999).
  7. Leu, Sou-Sen and Yang, Chung-Huei. “A GA-based Multicriteria Optimal Model for Construction Process under Resource Constraints.”  Journal of Construction Engineering and Management, ASCE, Vol.125, No.6, pp.420-427 (1999). 
  8. Leu, Sou-Sen, Chen, An-Ting and Yang, Chung-Huei. “A Fuzzy Optimal Model for Construction Resource Leveling Scheduling.”  Canadian Journal of Civil Engineering, Vol.26, pp.673-684 (1999). 
  9. Leu, Sou-Sen and Yang, Chung-Huei. “A Genetic-algorithm-based Resource-constrained Construction Scheduling System.” Journal of Construction Management and Economics, 17, pp.767-776 (1999).
  10. Chen, Yao-Zhong, Leu, Sou-Sen, and Chen,  Chiu-Nan, “Development of 3D Tunnel Deformation Measure and Information System.”  Journal of Rock Mechanics and Engineering, Chinese Institute of Rock Mechanics and Engineering, Vol.18 (Supplement), pp.1145-1150 (1999). (in chinese)
  11. Leu, Sou-Sen and Ho, Ching-Yun. “A WWW/GIS-based Construction Case Information System.”  Asia Pacific Building and Construction Management Journal, Vol.5, pp.29-35 (1999).
  12. Leu, Sou-Sen and Yang, Chung-Huei, “A GA-based Multicriteria Optimal Model for Time/Cost Tradeoff Scheduling under Resource Constraints.”  Journal of the Chinese Institute of Civil and Hydraulic Engineering, Vol.11, No.3, pp.559-566 (1999). (in chinese)
  13. Leu, Sou-Sen, Yang, Chung-Huei and Huang, Jiun-Ching. “Resource Leveling in Construction by GA-based Optimization and its DSS Application.” Journal of Automation in Construction, 10, pp.27-41 (2000).
  14. Leu, Sou-Sen and Yang, Pai-Lung. “A Unifying Cost-data Structure for Design Phase Cost-
    estimating.” International Journal of Computer-integrtaed Design and Construction, Vol.2, No.3, pp.193-202 (2000).
  15. Leu, Sou-Sen and Tzeng, Bing-Rong. “A CPM-based Construction Quality Inspection and Decision-aid System.”  Journal of Computer-aided Civil and Infrastructure Engineering, Vol.15, No.3, pp.233-239 (2000).
  16. Leu, Sou-Sen and Jeng, Yn-Mei, “An integrated technology Information System – An Example of Precasting Building Construction.” Journal of the Chinese Institute of Civil and Hydraulic Engineering, Vol.12, No.3, pp.611-620 (2000). (in chinese) 
  17. Leu, Sou-Sen, Chen, Chiu-Nan and Chang,  Shiu-Lin. “Data Mining for Tunnel Support Stability using Neural Networks.” Journal of Automation in Construction, Vol.10, pp.429-441 (2001). 
  18. Leu, Sou-Sen and Hwang, Shao-Ting. “An  Optimal Scheduling Model for Repetitive Projects with Shareable Resource Constraints.”  Journal of Construction Engineering and Management, ASCE, Vol.127, No.4, PP.270-280 (2001).
  19. Leu, Sou-Sen, Chen, An-Ting and Yang, Chung-Huei. “A GA-based Fuzzy Optimal Model for Construction Time-cost Trade-off.”  International Journal of Project Management, Vol.19, No.1 pp.47-58 (2001).. 
  20. Leu, Sou-Sen and Hwang, Shao-Ting. “A GA-based Model for Maximizing Precast Plant Production under Resource Constraints.”  Journal of Engineering Optimization, Vol.33, pp.619-642 (2001). 
  21. Leu, Sou-Sen and Hwang, Shao-Ting. “An Optimal Mixed-production Flow-shop Scheduling Model for Precast Production under Resource Constraints.”  Journal of Automation in Construction, Vol.11, pp.439-452 (2002). 
  22. Leu, Sou-Sen and Hung, Tzung-Heng. “A Genetic-algorithm-based Resource-constrained Construction Scheduling Simulation Model.”  Journal of Construction Management and Economics, Vol.20, pp. 131-141 (2002). 
  23. Leu, Sou-Sen and Hung, Tzung-Heng. “An Optimal Construction Resource Leveling Scheduling Simulation Model.”  Canadian Journal of Civil Engineering, Vol.29, No.2, pp.267-275 (2002). 
  24. Leu, Sou-Sen Leu and Yu, Jen-Kuei,  “Study of the Impact Factors of Hillside Construction Projects.” Journal of Architecture, Vol.39, pp.71-86 (2003). (in chinese) 
  25. Leu Sou-Sen and Lo, Hsien-Chuang, “Neural-network-based Regression Model of Ground Surface Settlement Induced by Deep Excavation,” Journal of Automation in Construction , Vol.13, pp.278-289 (2004). 
  26. Leu, Sou-Sen, Chen and Chang, Shiu-Lin.  “Image processing approach for tunnel excavation faces,” Journal of Automation in Construction, 14, pp.750~765 (2005) 
  27. Leu, Sou-Sen and Cheng, Fei-Wen, “Performance evaluation of parallel genetic algorithm on resource-constrained construction scheduling,” potentially accepted by  Journal of Automation in Construction (2005.08.20).
  28. Leu, Sou-Sen and Tsai, Rong-Chang, “Study  of Ultimate Bearing Capacity Prediction Model of Foundation Piles using Data Mining.”  submitted to  Journal of the Chinese Institute of Civil and Hydraulic Engineering (2007.03.20). (in chinese) 
  29. Andrew Shing-Tao Chang and Sou-Sen Leu,  “Data Mining Model for Identifying Project Performance Variables,”  International Journal of Project Management 24(3), pp.199-206 (2006). 
  30. Leu, Sou-Sen and Lin, You-Che, “Project  Performance Evaluation Based on Statistical
    Control Chart Principles.” Journal of Construction Engineering and Management, ASCE, Vol.134, No.10, pp.813-819 (2008).
  31. Leu, Sou-Sen and Cheng, Ying-Mei. “Constraint-based clustering model for determining contract packages of bridges maintenance inspection.” automation in construction,  Vol.17, No.6, p.682-690 (2008). 
  32. Leu, Sou-Sen and Cheng, Ying-Mei. “Constraint-based Clustering and Its Applications in Construction Management.” expert systems with application, 36 5761–5767 (2009)
  33. Ching, Jianye and Leu, Sou-Sen. “Bayesian updating of reliability of civil infrastructure facilities based on condition-state data and fault-tree model.”  Journal of Reliability Engineering and System Safety,  94 (2009) 1962–1974 
  34. Chang, Ching-Wu, Leu, Sou-Sen, and Lin, Cheng-Chung. “Analysis of Worker Deaths and Fatal Injuries during the Implementation of Government-Funded Projects of the Construction Industry in Taiwan.” submitted to International Journal of Industrial Ergonomics. (under 2nd review) (2009.10.12)
  35. Chang, Ching-Wu, Lin, Cheng-Chung, and Leu,  Sou-Sen, “Use of Association Rules to Explore Cause–Effect Relationships in Occupational Accidents in the Taiwan Construction Industry.” submitted to Journal of Safety Science (accepted) (2009.12)
  36. Chang, Ching-Wu, Leu, Sou-Sen, and Lin, Cheng-Chung. “Characteristic Analysis of Occupational Accidents at Small Construction Enterprises.” submitted to Journal of Safety Science (under 2nd review) (2009.11)
  37. Sou-Sen Leu*, Ming-Yuh Wang and Kuen- Jenn Chen, “Infrastructure plan performances in Taiwan – from the viewpoint of statistical process charts” potentially accepted by International Journal of Project Management (accepted) (2009.08)
  38. Leu, Sou-Sen and Chen, Tao-An, “Short-Term Trend Prediction and Cause-and-effect Analysis of Project Performances.” accepted by Journal of Computing in Civil Engineering, ASCE (2009.04.23)
  39. Leu, Sou-Sen and Lee, Ming, “Constructing Airport Rigid Pavement Service Performance
    Prediction Model using Imbalanced Data Mining Techniques” submitted to  Journal of
    Transportation Engineering, ASCE  (2008.12.01).

研討會論文

  1. 呂守陞,楊崇揮,陳安亭,洪宗亨,(2001.06),"資源限制營建排程與遺傳演算法之運用",人工智慧在營建土木工程運用研討會,正修技術學院,高雄市,pp.B1~B27。
  2. 呂守陞,葉啟輝,林聖峰(2000,01),"隧道開炸技術諮詢系統 之介紹",隧道開炸技術暨諮詢系統研討會,交通部台灣區國道新建工程局,台北市,pp.101-114。
  3. 呂守陞(1999,4)," 人工智慧在隧道安全評估之運用",營建工程施工安全與防災管理研討會(1999年代營營建工程研討會系列之一),國立台灣科技大學,台北市,pp.83-109。
  4. 許正航,呂守陞(1997,8),"風險管理在營建業之運用",營建管理與技術論文研討會(一),國立台灣科技大學營建工程技術研究所,pp.3-1~3-14。
  5. 謝玉山,呂守陞,陳慶光,蘇茂銓 (1997,3),"隧道施工管理"。隧道工程技術、機具與工法研討會,行政院公共工程委員會,pp.56-79。
  6. Sou-Sen Leu, Yong-Hwang Lin and Bing-Rong Tzeng (1996,10), "Real-time Construction Quality Inspection and Decision-aid System", International Conference on Construction Modernization and Education, CIB, Peijing, 1996. 計畫編號:NSC-85-2211-E-011-015
  7. Sou-Sen Leu and Ho-Chien Liu (1996,9),"Computer-aided Generation System of Quality Specifications for Construction Projects", The Organization and management of Construction, 8th International Symposium, CIB, Scotland, 1996.
  8. Sou-Sen Leu and Chung-Chin Dai (1996,6), "The Integrated Rock Tunnel Data Logging and Decision-aid System", The 13th International Symposium on Automation and Robotics in Construction, ISARC, Japanm 1996.
  9. 呂守陞,劉合琛(1995,9),"電腦輔助營建工程品質規範自動產生系統",品質管理學會八十四年研討會論文集,中華民國品質管理學會。
  10. 呂守陞等(1995,8),"岩體分類諮詢系統",第六屆大地工程學術研究討論會,P733?P740。
  11. Sou-Sen Leu and Pai-Jung Yang (1995,1),"Cost Database System for overall Construction Life Cycle", First International Conference on Construction Project Management, Innovation and Dynamism for future Prosperity, pp.551-558,計畫編號:NSC-82-0410-E-011-174
  12. 呂守陞(1994,11),"規劃設計階段估價之探討"中華民國建築學會,第七屆建築研究成果發表會論文集 pp.617-623,計畫編號:NSC-82-0410-E-011-174
  13. 呂守陞(1994,6),"多媒體在營建工程上之應用",中國工程師學會年會學刊。
  14. 黃俊清,呂守陞,(1993,3),"公共工程預算作業管理資訊系統",營建知訊,財團法人台灣營建研究中心。
  15. 呂守陞(1992,9),"營建技術資訊系統之探討",營建管理資訊化研討會論文集,中華民國營建管理協會, pp.III.1-III.23。
  16. 呂守陞(1992,5),"多體營建技術資訊系統",八十一年會學術研討會論文集,中華民國營建管理協會, pp56-67。
  17. Ioannou, P.G. and Leu, Sou-Sen (1991,5),"Construction Technology/Method indentification and Selection System", Symposiums of Construction Engineering and Management, ASCE, pp.330-336.
  18. 張淑玲,呂守陞(1999,04),”類神經網路技術在隧道安全預警運用之初步探討”, 第一屆營建工程與管理研究成果聯合發表會,第二冊,台北市,pp.303~310。
  19. 林唐任,賴豔君,呂守陞(2002),”資源限制下關係不固定排程尋優模式之探討”,第六屆營建工程與管理研究成果聯合發表會,成功大學,台南市,pp.37~42。
  20. Shih-Wei Lin, Shuo-Yan Chou, Lo, Hsien-Chuang Lo, and Sou-Sen Leu (2003), “A Frame Scaffold Layout Analysis and Derivation System”, 11th ISPE International Conference on Concurrent Engineering: Research and Application, China.
  21. 呂守陞,鄧明元,” 營建工程困難診斷與問題克服系列(一)─由工程失敗學談起”,營造天下,台灣區營造同業公會,106期, p8-p14 (2004)
  22. 呂守陞,鄧明元,” 營建工程困難診斷與問題克服系列(二)─困難問題系統分析的方法與工具”,營造天下,台灣區營造同業公會,107期, p9-16 (2004)
  23. 呂守陞,鄭吟梅, “資料探勘與其在營建工程之運用”,中國土木水利工程學會, (2005)。
  24. 呂守陞,周碩彥,羅獻章,林詩偉,林禎中,”框式施工架配置規劃之電腦輔助系統軟體製作”,勞工安全衛生研究季刊,第13卷第2期,pp.155-164(2005)。
  25. 呂守陞,鄧明元,”超越失敗,以系統思考診斷工程案例”,營建知訊,第274期,pp.52-59 (2005)
  26. 呂守陞,”資料探勘與管制圖技術於公共建設計畫績效評估與預測之研究”,工程科技通訊,國科會工程科技推展中心,第93期,pp. 10-16  (2007)
  27. 呂守陞,”因應變局 開創新利基”,營建知訊,財團法人台灣營建研究院,No.295,pp.24-27 (2007)。
  28. 趙曉周、賴昀暉、呂守陞、陳鴻濤,” 地工風險管理操作實務-以高架橋托底工程為例”,地工技術,第119期, (2009)。
  29. 呂守陞,劉紀明,陳政泰,”下水道推進工程施工流程再造”,土木水利會刊,民國98年第四季,中國土木水利工程學會 

專書及技術報告

  1. Leu,Sou-Sen(1992,2),"Object-oriented Representation Model of Construction Technology Information", Ph.D. Dissertation, University of Michigan, Ann Arbor, Michigan.
  2. 呂守陞(1997,10), "智慧型營建工程品質管理資訊系統之探討", 工程科技通訊, 國科會工程處工程科技推廣中心。
  3. 呂守陞(1994),規劃設計全程支援之工程單價資料庫系統之研究,行政院國家科學委員會專題研究計劃成果報告,計劃編號:NSC82-0410-E011-174
  4. 呂守陞(1995),建築鋼結構施工自動化之探討,行政院國家科學委員會專題研究計劃成果報告,計劃編號:NSC84-2211-E011-034
  5. 呂守陞(1996),智慧型營建工程品質管理資訊系統之研究,行政院國家科學委員會專題研究計劃成果報告,計劃編號:NSC85-2211-E011-015
  6. 呂守陞(1997),橋樑工程施工流程(配置)最適化之探討,行政院國家科學委員會專題研究計劃成果報告,計劃編號:NSC86-2211-E011-021
  7. 呂守陞(1998),系統模板配置/施工最適化策略模式之研究(I),行政院國家科學委員會專題研究計劃成果報告,計劃編號:NSC87-2211-E011-022
  8. 呂守陞(1999),混凝土橋樑工程施工安全技術手冊,行政院勞工委員會勞工安全衛生研究所。
  9. 廖宏鈞,呂守陞,陳志南(1999),隧道工程災害救難及職業病預防作業之研究,行政院交通部科技顧問室。
  10. 呂守陞,陳志南(1999),台灣隧道工程重要案例資料庫之建立,行政院公共工程委員會。
  11. 呂守陞(2000),台北市政府非工程單位工程管理問題之研究,台北市政府研究發展考核委員會。
  12. 張行道,呂守陞(2001),工技碼重編研究,財團法人中華顧問工程司。
  13. 呂守陞,周碩彥(2001),框式施工架配置規劃之電腦輔助系統研發,行政院勞工委員會勞工安全衛生研究所。
  14. 陳永祥,呂守陞,廖肇昌,李有豐,許凱麟(2002),公共工程延壽政策及相關技術之探討,行政院公共工程委員會。
  15. 陳舜田,沈進發,呂守陞,鄭明淵(2002),BOT計畫工程管理體系之探討,財團法人中華顧問工程司。
  16. 陳堯中,呂守陞,陳志南,周碩彥,陳立憲(2003),隧道三維變形與地質破壞模式之探討,交通部台灣國道新建工程局。
  17. 陳永祥,呂守陞等(2003),建構營建產業知識地圖、分類架構及知識交流標準,內政部營建署。 D.國科會計畫
  18. 規劃設計全程支援之工程單價資料庫系統之研究,民81.2-83.1
  19. 建築鋼構施工自動化之探討,民83.8-84.7
  20. 智慧型營建工程品質管理資訊系統之研究,民84.8-85.7
  21. 橋樑工程施工流程(配置)最適化之探討,民85.8-86.7
  22. 多評準模版工程配置最適化模式之研究,民86.8-87.7
  23. 子計畫五:營建工程技術文件整合資訊系統之研究(I),民87.8-88.7
  24. 營建工程資訊運籌管理資訊系統之研究(1/2)-子計畫三:營建工程技術文件整合資訊系統之研究,民87.8-88.7
  25. 國內特殊地質隧道工程之研究-子計畫一:卵礫石隧道工程行為之研究,民89.8-90.7
  26. 隧道工程開挖面影像處理與三維重建之研究,民89.8-90.7
  27. 營建工程資訊運籌管理資訊系統之研究(2/2)-子計畫三:營建工程技術文件整合資訊系統之研究,民89.8-90.7
  28. 建築鋼結構工程成本最適化評估模式之探討,民90.8-91.7
  29. 小波轉換在隧道工程影像處理與辨識之研究,民90.8-91.7
  30. 建築鋼結構最適化價值分析模擬系統之探討,民91.8-92.7
  31. 資料探勘技術研發與其在營建專案績效之運用與評估(1/2),民92.8-93.7
  32. 資料探勘技術研發與其在營建專案績效之運用與評估(2/2),民93.8-94.7
  33. 資料探勘與管制圖技術於公共建設計畫績效評估與預測之研究,民93.8-94.7
  34. 台灣隧道工程重要案例資料庫,委託單位:行政院公共工程委員會(1999)。
  35. 框式施工架配置規劃之電腦輔助系統,委託單位:行政院勞工委員會勞工安全衛生研究所(2001)。
  36. 隧道三維變形量測與分析電腦系統,委託單位:交通部台灣國道新建工程局(2003)。